Thursday, December 11, 2008

the soffit being prepaired for ground floor
groundfloor the laminated plywood being laid


connecting the downstand beam around the front of the tower

a veiw from the ground floor unit 3 location




veiw from balcony of the unit3 not yet there this is only groundfloor